Emergency and exit lights are cheap and easy to neglect, and failed units are a common inspection finding.
The Monthly Test
- Press the test button on each unit, or use the panel switch.
- Check that the lamps stay lit for at least 30 seconds.
- Write down the date, unit location, result and your initials.
The Annual Test
- Choose a low-occupancy time, and warn occupants.
- Run the units on battery for at least 90 minutes.
- Check for dim or failed lamps by the end of the test.
- Allow time to recharge: batteries are not ready straight away.
Tips
- Number the units on a floor plan so none are missed.
- Keep spare batteries or a replacement unit.
- Self-testing units reduce the labor, but still need their logs checked.
An electrician can replace units and run the annual test. Add it to your schedule.
